The screen door is installed on the edge of each station platform, one side is the public area of the platform, the other side is the tunnel driving area, and the power supply equipment of the screen door system, the central interface panel (PSC) of the control system, the interface equipment with the signal system and the integrated monitoring system are installed in the screen door equipment room.